Jim & Donna Snorek

  We began our new railroad with the installation of a water feature. Look for the main spillway into a 25 foot river that flows into a pond. Another spillway flows 30 feet into a pondless water collection area.

In 2011 we had laid down about 1400 feet of track including a 90 foot by 80 foot main line around two mountains. Inside the main line is a mountain loop, a river run and a four-trolley line.

About ten trains could be operating at once if the operator stays sober and sane. Track power is supplied by Bridewerks power supplies which also powers the EPL automatic operation.

When you visit us we hope to have added a mountain logging operation and a loop to the front of the house. Come and see one of the latest railroads in the Chicago area.

 

Return to the Photo Gallery