Glen & Liz Dolgner

  The Sonoran Dream Railroad began in June of 2005 with about 225’ of track. Always a work in progress, the layout was completely renovated during 2010.

There is now 475’ of track with 4 main lines, 2 tunnels and 4 bridges. A number of buildings make up our little town. The track is powered using Crest Train Engineer walk-around control system.

 

Return to the Photo Gallery